The Challenge

  • Hospital hot water scale control depended on six ageing salt softeners
  • Very hard Colmar water at approximately 330 ppm fed the domestic hot water system
  • Softener regeneration consumed significant salt and water
  • Ageing softener resins were due for replacement
  • A few Legionella alerts occurred on the hot water network each year

The Solution

Twelve HydroFLOW® units replaced the six softeners across the hospital’s domestic hot water system, covering 2,550 kW of total production: the main substation, the 300 kW Roseraie exchanger, the 200 kW Leisure and Balneo exchangers, a villa boiler and the domestic hot water tanks in three villas. All twelve were installed in one day without interrupting water service. With the softeners gone, hospital hot water scale control now comes from the signal alone, which keeps minerals from bonding to exchanger plates and pipe walls, so there is no salt, no regeneration water and no resin to replace.

Key Outcomes

R

No limescale maintenance in five years

R

Operating cost €50 vs €1,250 per 1,000 m³

R

Zero scale-related DHW pipe blockages

R

Plate exchanger free of limescale at five years

Independent Verification

All results in this study were measured and verified by third-party facilities managers and technical staff.

Ready to see more?

Ready to explore sustainable water treatment?

Get in touch to find out how HydroFLOW® can work for you.

© 2026 Hydropath Technology Ltd. All rights reserved