Case Study from HYDROPATH Asia
The Challenges
- Hot spring water hardness above 400 ppm
- Some systems requiring monthly maintenance
- Scale build-up affecting pumps and piping
- Spa facilities requiring bacteria control
The Solution
More than 30 HydroFLOW® units were installed across hot spring systems and spa facilities between November 2017 and June 2018. The signal disrupts the conditions that bond scale to surfaces, so deposits stay soft and flush away, extending maintenance intervals.
