Industrial water bath algae and chlorine dosing
Industrial water bath algae and biofouling were high at a US manufacturing plant, along with TDS and bacteria. The response, heavy chemical dosing and frequent blowdowns, was costing water as well as chemicals. In June 2025 one HydroFLOW® i150 was fitted to a six inch fibreglass pipe in the cooling loop for a 90-day evaluation. No algae was observed after installation, chlorine dosing was reduced gradually by 75%, and water quality and system performance were maintained. Blowdown was reduced, with the system operating at up to 3,000 µS/cm conductivity.
The Challenges
- Industrial water bath algae and biofouling were high across the baths
- TDS and bacteria levels were also high
- Heavy chemical dosing was required
- Frequent blowdowns were driving water usage
The Solution
- Unit installed: one HydroFLOW® i150
- Installation point: cooling loop
- Pipe size: six inch fibreglass
- Installed: June 2025
- Trial: 90-day evaluation with gradual chlorine reduction
The unit was fitted to the cooling loop upstream of the water baths to enable gradual reduction of chlorine dosing. With HydroFLOW® treatment, no algae was observed despite reduced chlorine levels, and filtration improved, capturing more solids.





