The Challenges
- High algae and biofouling in the baths
- Heavy chemical dosing required
- Frequent blowdowns and water usage
- High TDS, bacteria and algae levels
The Solution
One HydroFLOW® i150 unit was fitted to a 6″ fibreglass pipe in the cooling loop in June 2025 for a 90-day evaluation. The signal disrupts the conditions that let algae and biofilm establish, allowing chlorine dosing to be cut gradually while water quality holds.
