Summary

At an Eindhoven coatings factory, HydroFLOW® slowed the loss of RO permeate flow by about 70%, holding 4,400 L/h four weeks after a membrane clean where flow had previously slid towards 3,500 L/h. For an RO system running at 85% recovery with concentrate recirculated, slower scaling means longer between membrane cleans, and the customer bought both units after the early trial.

RO membrane scaling at an Eindhoven coatings factory

RO membrane scaling was cutting permeate flow at a coatings factory in Eindhoven, Netherlands, which uses reverse osmosis to make demineralised water for its production process. RO system 1 runs at 85% recovery with 2.0 m³/h of concentrate recirculated, and after a membrane clean in May 2018 its permeate flow fell from 5,600 to 3,500 L/h in about three months. After the next clean in September 2018, a HydroFLOW® P100 was fitted to the RO 1 feed line, with an HS40 ahead of the prefilter. The decline in permeate flow was then around 70% slower, flow was still 4,400 L/h after four weeks, and the customer bought both units.

The Challenge

  • RO membrane scaling caused rapid permeate-flow loss between cleans
  • Permeate flow fell from 5,600 to 3,500 L/h in about three months
  • The RO system ran at 85% recovery
  • 0 m³/h of concentrate was recirculated

The Solution

  • Units installed: one HydroFLOW® P100 and one HS40
  • Installation points: P100 on the RO 1 feed line, HS40 ahead of the prefilter
  • System: RO system 1, making demineralised water at 85% recovery
  • Installed: September 2018, after a membrane clean

To compare like with like, RO membrane scaling was measured from the same starting point both times: a fresh membrane clean. Permeate flow was logged after the May 2018 clean with no treatment, then again after the September 2018 clean with the units in place, and a linear trend was fitted to each period to compare how fast the flow fell.

Key Outcomes

R

~70% slower flow decline

R

85% recovery RO

R

4,400 L/h after 4 weeks

R

Both units purchased

Independent Verification

All results in this study were measured and verified by third-party facilities managers and technical staff.