Boise Paper: Treated Shower Nozzles Clear After 11 Weeks

Home 9 Case Studies and Results 9 Boise Paper: Treated Shower Nozzles Clear After 11 Weeks
Key results
11 weeks, treated nozzles clear
30 ft of pipework treated
No hydroblasting required

Summary

After 11 weeks, the shower unit treated by HydroFLOW® and its nozzles were substantially clearer than the untreated comparison, including the nozzle 30 ft down the line. A treated shower unit was compared with an untreated unit in the same bleach plant. The results supported chemical-free scale treatment for this application.

Case Study from HydroFLOW USA

Paper mill shower nozzle scale in a bleach plant

Paper mill shower nozzle scale was a recurring problem in the bleach plant at Boise Paper’s mill in Wallula, Washington. Severe limescale built up in the pipework and nozzles of several shower units, and scaled nozzles had to be hydroblasted or replaced. To measure the effect, one HydroFLOW® Custom 8” was fitted to the metal inlet pipe of shower unit E1, about 30 ft before its nozzles, while unit D1 was left untreated for comparison. After 11 weeks the treated E1 opening and nozzles were substantially clearer than D1, including the nozzle 30 ft down the line, and the treated unit needed no hydroblasting.

Paper mill shower nozzles 30 ft down the line: heavy scale in the untreated nozzle, clean bore in the treated nozzle

The Challenge

  • Paper mill shower nozzle scale built up in several bleach plant shower units
  • Severe limescale restricted the nozzle openings
  • Scaled nozzles needed periodic hydroblasting
  • Nozzles that could not be cleared had to be replaced

The Solution

  • Unit installed: one HydroFLOW® Custom 8”
  • Installation point: metal inlet pipe of shower unit E1, about 30 ft before the nozzles
  • Pipe: 8⅝ in outside diameter, metal
  • Comparison: shower unit D1 left untreated
  • Trial: 11 weeks, with the signal checked at 33 to 37 V peak to peak

The trial was set up as a direct comparison of paper mill shower nozzle scale on two shower units in the same bleach plant. E1 was treated from its inlet pipe, about 30 ft upstream of its nozzles, and D1 was left as it was. After 11 weeks the openings and nozzles of both units were inspected and photographed close up.

Key Outcomes

R

Treated unit opening much clearer than untreated

R

Treated nozzle 30 ft down the line clear

R

Treated nozzle stayed open

R

Substantially less visible scale build-up

Independent Verification

All results in this study were measured and verified by third-party facilities managers and technical staff.

Ready to see more?

Ready to explore sustainable water treatment?

Get in touch to find out how HydroFLOW® can work for you.

© 2026 Hydropath Technology Ltd. All rights reserved