
Tasmania Smelter: Strainer Cleans 2 Weeks to 4-5 Months
A Tasmanian zinc smelter extended seawater strainer cleaning from every two weeks to four or five months with one HydroFLOW® Custom 16 inch unit.
Discover how Hydropath® technology delivers sustainable, chemical-free water treatment across industries and continents.

A Tasmanian zinc smelter extended seawater strainer cleaning from every two weeks to four or five months with one HydroFLOW® Custom 16 inch unit.

A treated plate heat exchanger stayed largely unblocked over six months while its untreated twin blocked to 3 ft, holding 14-18% higher seawater flow.

An Italian gypsum mine kept its dewatering pump operational with a custom 200mm HydroFLOW® unit on a 700m pipeline, replacing three-monthly acid cleaning.

A 2.3 million sq ft US office complex cut cooling tower bio-counts from 100,000 CFU to below 1,000 within days with one HydroFLOW® Custom 14 inch unit.

A 700MW Great Lakes power plant cut scale and corrosion inhibitor use by 75.5% and saved 200 million gallons a year across its 10-cell cooling tower.

Orlando's Water Conserv II ran belt press No. 5 for 150 days without cleaning, cutting pan scale from 5 mm to 1 mm and polymer use by around 20%.

A Utah plant stopped $8,000 a month of struvite chemical and cut screw press cleaning from 30 hours to under four with one HydroFLOW® Custom 8 inch unit.

A cleaned belt press drum at Walla Walla stayed struvite-free for eight weeks, then scaled again within weeks of the HydroFLOW® unit being switched off.

A 60,000 hectare farm in Al Jouf cut well restart flushing from 30 minutes to 2 and reduced emitter clogging risk by up to 50% with four HydroFLOW® units.
Get in touch to find out how HydroFLOW® can work for you.
© 2026 Hydropath Technology Ltd. All rights reserved