Bio-counts fell from around 100,000 CFU to below 1,000 within days, a reduction of over 99%. Reduced scale was also reported in the cooling tower and chiller tubes. The planned 90-day trial led to the unit being bought outright, and the results led to additional HydroFLOW® units across the complex.

Case Study from HydroFLOW USA

Cooling tower bio-count reduction at a US Southeast office complex

Cooling tower bio-count reduction was needed at a complex with 2.3 million square feet across six office buildings, more than 50 restaurants and shops and three hotels, without compromising a water-saving strategy that ran the towers at high cycles of concentration. Bio-counts had reached around 100,000 CFU against a target below 10,000, and scale and biofilm were affecting the cooling tower and chiller surfaces. One HydroFLOW® Custom 14 inch unit was installed on the south-tower cooling and chiller system for a planned 90 day trial. Within days bio-counts fell below 1,000 CFU and scale and biofilm reduced. The trial led to the unit being bought outright, and further units followed across the complex.

The Challenge

  • Cooling tower bio-count reduction was needed without giving up the site’s water-saving strategy
  • Bio-counts had reached approximately 100,000 CFU
  • The required target was below 10,000 CFU
  • High cycles of concentration cut water use but caused severe scale and biological fouling
  • Scale and biofilm affected both cooling tower and chiller surfaces

Cooling tower fill before and after HydroFLOW, heavy scale and biofilm reduced at a US office complex

The Solution

  • Unit installed: one HydroFLOW® Custom 14 inch
  • Installation point: south-tower cooling and chiller water system
  • Trial: 90 days planned, leading to the unit being purchased outright

Cooling tower bio-count reduction was measured against the site’s own 10,000 CFU target, and the aim was better biological control without compromising the site’s water-saving strategy. The unit went on the south tower’s cooling and chiller water system, and reduced scale was later reported in both the tower and the chiller tubes. Bio-counts were followed from the start of the planned 90 day trial and moved within days.

Key Outcomes

R

Bio-counts fell from approximately 100,000 CFU to below 1,000 CFU

R

Reduced scale was reported in the cooling tower and chiller tubes

R

The result went far beyond the site's own target of below 10,000 CFU

R

Results led to additional HydroFLOW® units across the complex

Independent Verification

All results in this study were measured and verified by third-party facilities managers and technical staff.

Ready to see more?

Ready to explore sustainable water treatment?

Get in touch to find out how HydroFLOW® can work for you.

© 2026 Hydropath Technology Ltd. All rights reserved