US Office Complex: Bio-Counts 100,000 to Under 1,000

Home 9 Case Studies and Results 9 US Office Complex: Bio-Counts 100,000 to Under 1,000
Key results
Over 99% lower bio-count
Below 1,000 CFU within days
Estimated 6 month ROI

Case Study from HydroFLOW USA

Cooling tower bio-count reduction at a US Southeast office complex

Cooling tower bio-count reduction was needed at a 2.3 million square foot complex of six office buildings, more than 50 restaurants and shops and three hotels, without giving up the high cycles of concentration that saved water. Bio-counts had reached around 100,000 CFU against a target below 10,000, and scale and biofilm were affecting the cooling tower and chiller surfaces. One HydroFLOW® Custom 14 inch unit was installed on the south-tower cooling and chiller system for a planned 90 day trial. Within days bio-counts fell below 1,000 CFU and scale and biofilm reduced. The unit was bought outright before the trial ended, and further units followed across the complex.

The Challenge

  • Cooling tower bio-count reduction was needed without giving up the site’s water-saving strategy
  • Bio-counts had reached approximately 100,000 CFU
  • The required target was below 10,000 CFU
  • High cycles of concentration cut water use but caused severe scale and biological fouling
  • Scale and biofilm affected both cooling tower and chiller surfaces

Cooling tower fill before and after HydroFLOW, heavy scale and biofilm removed at a US office complex

The Solution

  • Unit installed: one HydroFLOW® Custom 14 inch
  • Installation point: south-tower cooling and chiller water system
  • Trial: 90 days planned, unit purchased before the trial ended

Cooling tower bio-count reduction was measured against the site’s own 10,000 CFU target, with the tower kept at high cycles of concentration. The unit went on the south tower’s cooling and chiller water system, so the tower and the chiller tubes were treated together. Bio-counts were followed from the start of the planned 90 day trial and moved within days.

Key Outcomes

R

Bio-counts fell from approximately 100,000 CFU to below 1,000 CFU

R

Reduced scale was reported in the cooling tower and chiller tubes

R

The result went far beyond the site's own target of below 10,000 CFU

R

Results led to additional HydroFLOW® units across the complex

Independent Verification

All results in this study were measured and verified by third-party facilities managers and technical staff.

Summary

Bio-counts fell from around 100,000 CFU to below 1,000, a reduction of over 99%, without dropping the cycles of concentration that were saving the site water. Reduced scale was also reported in the cooling tower and chiller tubes. Buying the unit before the trial ended, then adding further HydroFLOW® units across the complex, is the operator's own verdict.

Ready to see more?

Ready to explore sustainable water treatment?

Get in touch to find out how HydroFLOW® can work for you.

© 2026 Hydropath Technology Ltd. All rights reserved