
Hong Kong PHE: Treated Clear, Untreated Blocked 3 ft
A treated plate heat exchanger stayed largely unblocked over six months while its untreated twin blocked to 3 ft, holding 14-18% higher seawater flow.
Discover how Hydropath® technology delivers sustainable, chemical-free water treatment across industries and continents.

A treated plate heat exchanger stayed largely unblocked over six months while its untreated twin blocked to 3 ft, holding 14-18% higher seawater flow.

A 2.3 million sq ft US office complex cut cooling tower bio-counts from 100,000 CFU to below 1,000 within days with one HydroFLOW® Custom 14 inch unit.

A six month trial at Bucharest's Palace of Parliament cut hot water pipework biofouling by about 50% in both new and 30+ year-old pipe sections.

Northview REIT's 180-unit London, Ontario building ended Parafoss dosing and calculated minimum annual savings of $11,639 with two HydroFLOW® i60 units.

A 400+ location gas station and convenience store chain cut scale and biofilm across food equipment and water systems, with ROI inside 6–12 months.

A global bank building in Hong Kong improved chiller efficiency 16% and reduced existing scale on its chiller system.

HydroFLOW treatment removed condenser biofilm and lifted COP 10-15% across five seawater cooled chiller plants.

35+ HydroFLOW units across an amusement park and its hotels in Hong Kong cut chemical use and maintenance across multiple water systems.

A HydroFLOW i8" Custom unit cut cooling tower blowdown 68% and reduced chemicals at an Arizona municipal building.
Get in touch to find out how HydroFLOW® can work for you.
© 2026 Hydropath Technology Ltd. All rights reserved