The Challenges
- High water use from blow-down cycles
- Continuous chemical dosing required
- Water scarcity affecting operations
- Need to stay within industry standards
The Solution
One HydroFLOW® i8″ Custom unit was fitted to the condenser water line between the tower and chiller for a 5.5-month trial. The signal disrupts the conditions that bond scale to surfaces, letting the system run at high conductivity with far less blowdown.
