Palace of Parliament: 50% Less Biofouling in 6 Months

Home 9 Case Studies and Results 9 Palace of Parliament: 50% Less Biofouling in 6 Months
Key results
~50% less biofouling
New pipe protected
30+ year-old pipe improved

Hot water pipework biofouling at the Palace of Parliament

Hot water pipework biofouling had built up across both new and decades-old sections of the Palace of Parliament in Bucharest, a building of nine levels above ground, nine below and more than 1,000 rooms. Thick deposits were altering water quality, rust layers and flakes were accumulating, and scale was present in the supply pipes. One HydroFLOW® i120 was fitted to the 120 mm pump-free hot-water supply line. Over six months a newer galvanised section was assessed against adjacent steel pipe in service for more than 30 years. Visual inspection estimated about 50% less biofouling across both sections, and deposits inside the old pipe visibly reduced.

The Challenge

  • Hot water pipework biofouling had built up across both new and decades-old sections
  • Thick biofouling deposits were altering water quality
  • Rust layers and flakes accumulated inside the pipework
  • Scale was also present inside the water-supply pipes
  • The building runs nine levels above ground, nine below and more than 1,000 rooms

Old steel hot water pipe with rust and biofouling before HydroFLOW, and less fouling after, Bucharest

The Solution

  • Unit installed: one HydroFLOW® i120
  • Installation point: pump-free hot-water supply line
  • Pipe size: 120 mm
  • Monitoring period: six months, by visual inspection

Hot water pipework biofouling was assessed on new and old pipe side by side, with a newer galvanised section visually compared against adjacent steel pipework in service for more than 30 years. The inspections looked for further biofouling and calcium or magnesium salt deposition on the newer pipe, and for change in the deposits already inside the old pipe.

Key Outcomes

R

Visual inspection estimated about 50% less biofouling across both tested pipe sections

R

Further calcium and magnesium salt deposition was not observed on the newer pipe

R

The newer pipe was protected from further biofouling deposits

R

Existing deposits inside the 30+ year-old pipework visibly reduced

Independent Verification

All results in this study were measured and verified by third-party facilities managers and technical staff.

Summary

Visual inspection estimated about 50% less biofouling on both sections, the newer pipe showed no further calcium or magnesium salt deposition, and deposits in the 30+ year-old pipe visibly reduced. Old steel pipe and new galvanised pipe responding in the same direction is the useful finding for any large building with mixed-age services. The Palace of Parliament is the biggest building in the commercial set by some distance.