Northview REIT: $11,639 Minimum Annual Saving and a 2-Year Payback

Home 9 Case Studies and Results 9 Northview REIT: $11,639 Minimum Annual Saving and a 2-Year Payback
Key results
$11,639 minimum annual saving
2 year calculated payback
Chemical dosing eliminated

Summary

The report calculated minimum annual savings of $11,639.16, reaching $139,669.92 over an assumed 12-year system life, with a two year payback. The final inspection reported no corrosion in the boiler tubes and no new scale.

Case Study from HydroFLOW Canada

Boiler water treatment ROI at a Northview REIT building in Ontario

Boiler water treatment ROI had to be proven before Northview REIT would consider a wider rollout. At an 11-storey residential building in London, Ontario, visible scale had formed within three months on a relatively new Futura boiler serving roughly 180 rental units, and the system depended on Parafoss dosing. Two HydroFLOW® i60 units were installed on 2-inch copper pipes, one before the boiler pump inlet and one on the cold make-up line, for a pilot from 30 January to 23 July 2020. Final inspection found the heat-transfer surfaces clear with no new scale or tube corrosion, Parafoss was dropped, and the report calculated minimum annual savings of $11,639.16 and a two year payback.

The Challenge

  • Boiler water treatment ROI had to be proven before a wider portfolio rollout
  • Visible scale build-up developed within three months on a relatively new boiler
  • Scale threatened the boiler’s heat-transfer efficiency
  • The system relied on Parafoss chemical dosing
  • Scale increased the risk of higher energy and operating costs

Boiler tube sheet before and after HydroFLOW, limescale build-up removed at Northview residential building, London, Ontario

The Solution

  • Units installed: two HydroFLOW® i60
  • Installation point: before the boiler pump inlet, and on the cold make-up water line
  • Pipe size: 2-inch copper
  • Trial: 30 January to 23 July 2020
  • Dosing stopped: Parafoss

Boiler water treatment ROI was calculated in the pilot report. One unit treated the water entering the boiler pump and the other the cold make-up water. At the end of the pilot, photographic inspection checked the heat-transfer surfaces for deposits and the tubes for corrosion, and the report built its savings from three areas, including a calculated $7,500 a year from stopping chemical treatment.

Key Outcomes

R

The report calculated minimum annual savings of $11,639.16 across three areas

R

Stopping chemical treatment alone represented a calculated $7,500 a year

R

Calculated savings reached $139,669.92 over the assumed 12-year system life

R

Final inspection found heat-transfer surfaces clear, with no new scale and no tube corrosion

Independent Verification

All results in this study were measured and verified by third-party facilities managers and technical staff.