
Guelph WWTP: Belt Press Downtime Cut From 3 Days to 6 Hours
A HydroFLOW® i160 stopped new struvite on a Guelph WWTP belt press for 60+ days and cut maintenance downtime from three days to six hours.
Discover how Hydropath® technology delivers sustainable, chemical-free water treatment across industries and continents.

A HydroFLOW® i160 stopped new struvite on a Guelph WWTP belt press for 60+ days and cut maintenance downtime from three days to six hours.

A HydroFLOW® i160 kept centrifuge ports and centrate pipework clear of struvite at Hamilton’s Woodward Avenue WWTP, with payback under a year.

HydroFLOW® cut daily chlorine use by 51% at Kitchener’s Lyle Hallman indoor pool, with no shock treatments needed and less chlorine smell.

One HydroFLOW® i100 cut supply-line clogging on a steel mill's galvanising spray bars from 65% to 10%, with no blockages reported for a year.

Northview REIT's 180-unit London, Ontario building ended Parafoss dosing and calculated minimum annual savings of $11,639 with two HydroFLOW® i60 units.

The 92-suite Redwood Inn in Alberta went six months with no hot water tank cleaning, down from every six weeks, with one HydroFLOW® C100.

Two HydroFLOW Custom units cut ferric chloride dosing up to 50% while holding discharge compliance at a Hamilton food WWTP.

Three HydroFLOW Custom 24" units cut antiscalant dosing to 0.0 ppm at Imperial Oil's Kearl Lake facility in Canada.

Two HydroFLOW I-120 units protected boiler equipment and cut chemical dosing at Rolling Mix Concrete in Calgary for 6+ years.
Get in touch to find out how HydroFLOW® can work for you.
© 2026 Hydropath Technology Ltd. All rights reserved