Calgary Concrete Boilers: 6+ Years Protected, Less Chemical

Home 9 Case Studies and Results 9 Calgary Concrete Boilers: 6+ Years Protected, Less Chemical
Key results
6+ years protected operation
Reduced chemical demand
2 boiler installations

Concrete plant boiler scale at two Calgary facilities

Concrete plant boiler scale and biofouling were affecting two concrete batching facilities in Calgary, at North and Railway Street. Chemical dosing was needed regularly, equipment protection was limited, and the dosing sat uneasily with the company’s sustainability policy. From spring 2017 two HydroFLOW® I-120 units were installed on the boiler systems at the two sites, one approach for both. Scale and biofouling were controlled, chemical dosing fell at both sites, and the boilers have been protected for more than six years since. Winter operation puts the boilers under their heaviest load, and the units have needed no attention beyond routine checks.

The Challenges

  • Concrete plant boiler scale and biofouling were affecting boilers at two sites
  • Chemical dosing was regularly required on the boiler systems
  • Equipment protection on the boiler systems was limited
  • Chemical dosing conflicted with the company’s sustainability goals
  • Both sites needed the same result from the same approach

The Solution

  • Units installed: two HydroFLOW® I-120 units across two sites
  • Installation point: boiler systems at the North and Railway Street facilities, Calgary
  • Installed: spring 2017
  • Previous treatment: regular chemical dosing

Both facilities were fitted in the same season, with the two I-120 units installed on the boiler systems across the two sites. The signal disrupts the conditions that bond scale and biofilm to surfaces. With concrete plant boiler scale and biofouling controlled, chemical dosing was reduced at both sites, and they have run on the same maintenance schedule since.

Key Outcomes

R

Boiler equipment protected over six years

R

Scale and biofouling minimised

R

Chemical dosing requirements reduced

R

Second unit fitted after positive results

Independent Verification

All results in this study were measured and verified by third-party facilities managers and technical staff.

Summary

The boilers at both sites have been protected for more than six years, with chemical dosing reduced. Six years is long enough to rule out a good first season. For concrete producers, the relevant number is how many boiler seasons have passed without the chemical dosing coming back. Because both sites were fitted in the same season and have run on the same maintenance schedule since, they are a useful pair for anyone planning a multi-site rollout in a cold climate.

Ready to see more?

Ready to explore sustainable water treatment?

Get in touch to find out how HydroFLOW® can work for you.

© 2026 Hydropath Technology Ltd. All rights reserved