Maple Leaf Canada: 50% Ferric Cut, $47.5k Saved

Home 9 Case Studies and Results 9 Maple Leaf Canada: 50% Ferric Cut, $47.5k Saved
Key results
50% ferric reduction
91.8% cBOD reduction
$47.5k annual chemical savings

Summary

Ferric chloride dosing was reduced by up to 50%, from 200 ppm to 100 ppm, saving $47,500 a year while discharge compliance was maintained at reduced dosing. cBOD reduction reached up to 91.8%, turbidity was reduced by 85.86%, and lower chemical use cut emissions by 8,949 kg CO2-eq a year.

Ferric dosing reduction on a food plant DAF

A ferric dosing reduction was needed at Maple Leaf Foods’ Hamilton facility, where the dissolved air flotation system ran on a fixed ferric dose of 200 ppm. The chemical cost was high, so was the carbon footprint that came with it, the system was near its operational limits, and there was a real risk of fines if discharge limits were exceeded. In October 2023 two HydroFLOW® Custom units, 12 and 14 inch, were fitted to the DAF feed lines for a 90-day trial, and ferric was reduced in stages. Dosing fell by up to 50%, from 200 ppm to 100 ppm, with discharge compliance maintained at reduced dosing, saving $47,500 a year.

The Challenges

  • A ferric dosing reduction was needed with the dose fixed at 200 ppm
  • Chemical cost and carbon impact were both high
  • The DAF system was running near its operational limits
  • Exceeding discharge limits carried a risk of fines
  • There was limited scope for further optimisation

The Solution

  • Units installed: two HydroFLOW® Custom units, 12 inch and 14 inch
  • Installation point: DAF feed lines
  • Installed: October 2023
  • Trial: 90 days, with ferric reduced in stages
  • Previous treatment: fixed ferric dose of 200 ppm

Ferric was dosed to maintain discharge compliance. With the two units fitted to the DAF feed lines, the ferric dosing reduction was taken in stages over the 90-day trial, and all discharge parameters remained within municipal limits at reduced dosing. With HydroFLOW® treatment, ferric chloride fell from 200 ppm to 100 ppm, cBOD reduction reached up to 91.8%, and turbidity reduction of 85.86% was maintained within discharge requirements.

Key Outcomes

R

Ferric chloride cut from 200 ppm to 100 ppm

R

Discharge parameters stayed within limits

R

Up to 91.8% cBOD reduction achieved

R

Annual savings of $47,500 delivered

Independent Verification

All results in this study were measured and verified by third-party facilities managers and technical staff.

Ready to see more?

Ready to explore sustainable water treatment?

Get in touch to find out how HydroFLOW® can work for you.

© 2026 Hydropath Technology Ltd. All rights reserved