Case Study from HydroFLOW Canada
The Challenge
- Hot water tank limescale built up at around 1 inch every six weeks
- Two 80-gallon domestic hot-water tanks needed cleaning every six weeks
- Tank drains clogged and required high-pressure unblocking
- Deposits repeatedly affected bathroom taps
- Three suites eventually became unavailable to guests
The Solution
One HydroFLOW® C100 commercial unit was fitted to the hotel’s cold-water feed serving both 80-gallon hot-water tanks. Over the following six months neither tank needed routine draining or cleaning, scale fell to about a sixteenth of an inch, the drains flowed freely without a high-pressure hose, and all three suites returned to use.