Redwood Inn: Six Months With No Hot Water Tank Clean

Home 9 Case Studies and Results 9 Redwood Inn: Six Months With No Hot Water Tank Clean
Key results
6 months with no tank cleaning
94% less scale accumulation
3 suites back in service

Case Study from HydroFLOW Canada

Hot water tank limescale at the Redwood Inn

Hot water tank limescale was building at around an inch every six weeks in the two 80-gallon tanks at the 92-suite Redwood Inn. Both tanks needed cleaning every six weeks, the drains clogged and needed a high-pressure hose, deposits kept reaching the bathroom taps, and three suites had eventually been taken out of service. One HydroFLOW® C100 was fitted to the cold-water feed serving both tanks. Over the following six months neither tank needed routine draining or cleaning, scale fell to about a sixteenth of an inch, the drains flowed freely and all three suites went back into use.

The Challenge

  • Hot water tank limescale built up at around 1 inch every six weeks
  • Two 80-gallon domestic hot-water tanks needed cleaning every six weeks
  • Tank drains clogged and needed a high-pressure hose to unblock
  • Deposits repeatedly affected the bathroom taps
  • Three suites eventually became unavailable to guests

Hotel hot water tank flange before and after HydroFLOW, limescale removed within six weeks, Redwood Inn Alberta

The Solution

  • Unit installed: one HydroFLOW® C100 commercial unit
  • Installation point: cold-water feed serving both 80-gallon hot-water tanks
  • Monitoring period: six months

Hot water tank limescale was treated at the shared cold feed, so a single unit covered both tanks before the water was heated. Over the following six months neither tank needed its routine draining or cleaning, and the drains no longer needed a high-pressure hose to clear blockages.

Key Outcomes

R

Neither hot-water tank required routine draining or cleaning for six months

R

The drains no longer needed a high-pressure hose to clear blockages

R

Scale fell from around 1 inch every six weeks to about 1/16 inch after six months

R

Scale issues affecting bathroom taps were resolved, returning all three suites to use

Independent Verification

All results in this study were measured and verified by third-party facilities managers and technical staff.

Summary

Scale fell from around an inch every six weeks to about a sixteenth of an inch after six months, a 94% reduction, and all three suites returned to use. Three suites out of service is lost revenue every night, and it is the number that turned a maintenance nuisance into a business case. One C100 on the cold feed is the post for small hotels with tank-fed hot water.

Ready to see more?

Ready to explore sustainable water treatment?

Get in touch to find out how HydroFLOW® can work for you.

© 2026 Hydropath Technology Ltd. All rights reserved