
US Hospital Ice Machines: Biofilm Purged in 3 Weeks
An orthopedic surgery hospital purged hidden ice machine biofilm within 3 weeks of fitting a HydroFLOW® S38, leading to rollout across all 112 machines.
Discover how Hydropath® technology delivers sustainable, chemical-free water treatment across industries and continents.

An orthopedic surgery hospital purged hidden ice machine biofilm within 3 weeks of fitting a HydroFLOW® S38, leading to rollout across all 112 machines.

A French holiday home residence cut hot water cylinder limescale from 200 kg a year to under 10 kg with two HydroFLOW® C60 units, saving €1,750 a year.

Half Moon Resort in Jamaica went eight months without removing a hot water heater for cleaning, down from monthly, with one HydroFLOW® C150.

Hilton Prince Kuhio Waikiki cut dishwasher water spotting on dishes and glassware within 60 days using one HydroFLOW® S38 on the pump line.

The 92-suite Redwood Inn in Alberta went six months with no hot water tank cleaning, down from every six weeks, with one HydroFLOW® C100.

Grand Hotel Terme di Comano brought every certified Legionella sample below 10 CFU/L and stayed within limits for seven months with three HydroFLOW® units.

A 400+ location gas station and convenience store chain cut scale and biofilm across food equipment and water systems, with ROI inside 6–12 months.

An Indiana hospital cut Legionella from 7 CFU/mL to below 1 CFU/mL in 16 days with HydroFLOW® units on its potable water line and ice machine feeds.

A Middle East cement plant stopped daily cleaning of 24 gas conditioning tower nozzles using a HydroFLOW C120 unit.
Get in touch to find out how HydroFLOW® can work for you.
© 2026 Hydropath Technology Ltd. All rights reserved