Indiana Hospital: Legionella Below 1 CFU/mL in 16 Days

Home 9 Case Studies and Results 9 Indiana Hospital: Legionella Below 1 CFU/mL in 16 Days
Key results
<1 CFU/mL in 16 days
15 months stable results
$75k treatment system avoided

Case Study from HydroFLOW USA

Hospital legionella control on the incoming potable line

Hospital Legionella control was failing at an Indiana hospital, where quarterly tests showed Legionella above the 1 CFU/mL target, with contamination averaging 7 CFU/mL. Flushing and equipment replacement were expensive, and a $75,000 treatment system was being considered. In July 2022, as a 90-day proof of concept, a HydroFLOW® i100 was installed on the four inch potable water line entering the building, with a HydroFLOW® S38 serving 14 ice machines. Counts fell to 1 CFU/mL or non-detectable within 16 days, measured against the hospital’s own target, and the $75,000 system was not needed.

The Challenge

  • Hospital Legionella control was failing, with quarterly tests above the 1 CFU/mL target
  • Average contamination had reached 7 CFU/mL
  • Flushing and equipment replacement were expensive
  • A $75,000 treatment system was being considered
  • The result had to be proven within a 90-day window

The Solution

  • Unit installed: 1 × HydroFLOW® i100 and 1 × HydroFLOW® S38
  • Installation point: i100 on the incoming potable main; S38 serving 14 ice machines
  • Pipe size: four inch
  • Installed: July 2022
  • Trial: 90-day proof of concept

The i100 went on the incoming main without cutting the pipe or shutting off supply to the wards, so the proof of concept could start in the middle of a normal operating month. The S38 covered the 14 ice machines. Treatment reduces the biofilm growth linked to Legionella, and hospital Legionella control was then tracked against the 1 CFU/mL target.

Key Outcomes

R

Legionella fell from 7 CFU/mL to below 1 CFU/mL

R

Results remained stable after 15 months

R

Most samples non detectable within 16 days

R

Proposed $75,000 treatment system not required

Independent Verification

All results in this study were measured and verified by third-party facilities managers and technical staff.

Summary

Counts fell to 1 CFU/mL or non-detectable within 16 days, and the result came in well under the cost of the $75,000 system that had been on the table. Sixteen days against a quarterly test cycle is the figure a hospital water safety group will notice. For facilities teams weighing a new treatment system, the 90-day proof of concept showed the result on the hospital's own supply first.

Ready to see more?

Ready to explore sustainable water treatment?

Get in touch to find out how HydroFLOW® can work for you.

© 2026 Hydropath Technology Ltd. All rights reserved