Half Moon Jamaica: 8 Months With No Heater Removal

Home 9 Case Studies and Results 9 Half Moon Jamaica: 8 Months With No Heater Removal
Key results
8+ months, no heater removal
Heater cores stayed clean
Washer internals clear

Summary

No heater needed removing in eight months of operation, and the supervisory system showed reduced fuel consumption.

Case Study from HydroFLOW Jamaica

Resort hot water heater scale at Half Moon, Jamaica

Resort hot water heater scale was building in the heater cores at Half Moon in Jamaica within a single month. The heaters served guest rooms, kitchens and laundry, removing one for cleaning needed an overhead crane, and pipes and valves were serviced monthly. In the laundry, washing machine windows were so caked that inspection was impossible. One HydroFLOW® C150 was installed on the heater supply header between units, treating the heaters and the laundry together. No heater removal was required after eight months of operation. Heater cores remained clear at three months, washing machine windows and internals were clear at five months, and reduced fuel consumption was observed on the supervisory system.

The Challenge

  • Resort hot water heater scale was building in heater cores within a single month
  • Heaters served guest rooms, kitchens and laundry across the resort
  • Removing a heater for cleaning required an overhead crane
  • Pipes and valves needed servicing every month
  • Washing machine windows were so caked with scale that inspection was impossible

The Solution

  • Unit installed: one HydroFLOW® C150
  • Installation point: heater supply header, between units
  • Trial duration: more than five months; no heater removal required after eight months of operation

Resort hot water heater scale was treated at the header, so every heater downstream and the laundry system were covered from one installation point. Heater cores remained clean, frequent servicing of heaters, pipes and valves was eliminated, and reduced fuel consumption was observed on the resort’s supervisory system.

Key Outcomes

R

No heater removal required after eight months of operation

R

Washing machine windows and internals remained clear

R

Heater cores remained clean and operational

R

Reduced fuel consumption observed on the supervisory system

Independent Verification

All results in this study were measured and verified by third-party facilities managers and technical staff.