Half Moon Jamaica: 8 Months With No Heater Removal

Home 9 Case Studies and Results 9 Half Moon Jamaica: 8 Months With No Heater Removal
Key results
8+ months, no heater removal
Heater cores stayed clean
Washer internals clear

Case Study from HydroFLOW Jamaica

Resort hot water heater scale at Half Moon, Jamaica

Resort hot water heater scale was building in the heater cores at Half Moon in Jamaica within a single month. The heaters served guest rooms, kitchens and laundry, removing one for cleaning needed an overhead crane, and pipes and valves were serviced monthly. In the laundry, washing machine windows were so caked that inspection was impossible. One HydroFLOW® C150 was installed on the heater supply header between units, treating the heaters and the laundry together. Eight months on, no heater had needed removing, the cores were clean, the washing machine windows stayed clear, and the supervisory system showed lower fuel consumption.

The Challenge

  • Resort hot water heater scale was building in heater cores within a single month
  • Heaters served guest rooms, kitchens and laundry across the resort
  • Removing a heater for cleaning required an overhead crane
  • Pipes and valves needed servicing every month
  • Washing machine windows were so caked with scale that inspection was impossible

The Solution

  • Unit installed: one HydroFLOW® C150
  • Installation point: heater supply header, between units
  • Monitoring period: eight months of operation

Resort hot water heater scale was treated at the header, so every heater downstream and the laundry system were covered from one installation point. Over eight months the heater cores stayed clean and servicing of heaters, pipes and valves dropped away, while fuel consumption was followed on the resort’s supervisory system.

Key Outcomes

R

No heater removal required after eight months of operation

R

Washing machine windows and internals remained clear

R

Heater cores remained clean and operational

R

Reduced fuel consumption observed on the supervisory system

Independent Verification

All results in this study were measured and verified by third-party facilities managers and technical staff.

Summary

No heater needed removing in eight months of operation, and the supervisory system showed reduced fuel consumption. A crane to clean a water heater is the kind of detail that stays with an engineer, and so is a washing machine window too caked to see through. Eight months without lifting a heater is the resort reference in the hotel set.

Ready to see more?

Ready to explore sustainable water treatment?

Get in touch to find out how HydroFLOW® can work for you.

© 2026 Hydropath Technology Ltd. All rights reserved