The Challenge
- Pump impellers became blocked by heavy scale deposits
- Engine overheating resulted from scaling buildup
- Acid cleaning was necessary every three months
- Metal rings and hydraulic joints experienced cracking

The Solution
A HydroFLOW® Custom 200mm unit was installed on 1 August 2012 on the flexible pipeline between the underground pump and mine entrance, around 350m from the pump, protecting a 700m pipeline with 90m of vertical lift. The signal disrupts the conditions that bond scale to surfaces, so minerals form powder-like suspended crystals instead of hard scale.