South Africa Dairy Condenser: No New Scale, No Chemicals

Home 9 Case Studies and Results 9 South Africa Dairy Condenser: No New Scale, No Chemicals
Key results
0 new scale observed
3 month softening period
0 chemical dosing

Summary

Condenser No. 4 operated without chemical dosing, with no new scale observed and existing deposits softened and removable by hand. It was compared with an untreated condenser after cleaning, and its nozzles, tubes and panels remained largely scale free.

Case Study from HydroFLOW South Africa

Dairy condenser scale at a South African dairy

Dairy condenser scale had built up hard on the tubes and internal panels of Condenser No. 4 at a South African dairy. Heavy deposits covered the spray nozzles and frames, heat transfer efficiency was reduced, and the site relied on continuous chemical dosing. In May 2020 one HydroFLOW® i120 was fitted to the 100 mm vertical circulating pipe of the condenser. No new scale was observed on cleaned surfaces, the existing deposits softened and became removable by hand, and the nozzles, tubes and panels remained largely scale free. The condenser operated without chemical dosing, and reduced scale insulation improved heat exchange efficiency.

The Challenges

  • Dairy condenser scale had built up hard on tubes and internal panels
  • Heavy deposits covered the spray nozzles and frames
  • Heat transfer efficiency was reduced
  • The site relied on continuous chemical dosing

Condenser tubes and spray nozzles heavily scaled before HydroFLOW, and clean tubes and nozzles after

The Solution

  • Unit installed: HydroFLOW® i120
  • Installation point: vertical circulating pipe, Condenser No. 4
  • Pipe size: 100 mm
  • Installed: May 2020
  • Dosing stopped: continuous chemical dosing

The i120 was fitted to the vertical circulating pipe of Condenser No. 4, which was compared with an untreated condenser after cleaning. Under HydroFLOW® treatment, existing deposits softened over time and no new dairy condenser scale was observed during operation. The spray nozzles were clean after three months of operation, and Condenser No. 4 operated without chemical dosing.

Key Outcomes

R

No new scale formed on cleaned surfaces

R

Condenser ran without chemical dosing

R

Existing deposits softened and removable by hand

R

Outperformed a reference condenser

Independent Verification

All results in this study were measured and verified by third-party facilities managers and technical staff.