Case Study from HydroFLOW France
Swimming pool water saving through fewer backwashes
Swimming pool water saving was needed at an indoor pool in Colmar that backwashed its filters 78 times a year. Each wash used 52.5 cubic metres of heated, chlorinated water, and rising operating costs made water and energy savings essential. On 13 October 2014 one HydroFLOW® P160 was fitted upstream of the filtration system. Flocculation improved ahead of the filters and backwash demand fell. Annual backwash water demand dropped by 2,535 cubic metres, heat loss fell by 41,275 kWh, filter washing used 15% less chlorine, and the project achieved a 0.7-year return on investment.
The Challenges
- A swimming pool water saving was needed, with high consumption per backwash
- Filters were being washed 78 times a year
- Heated, chlorinated water was lost to drain in every wash
- Operating costs from water and energy use were rising
The Solution
- Unit installed: HydroFLOW® P160
- Installation point: upstream of the filtration system
- Installed: 13 October 2014
- Previous backwash rate: 78 filter washes a year
The P160 went on the pipe ahead of the filters. Hydropath treatment supported better flocculation before filtration, and lower backwash demand reduced the loss of heated, chlorinated water. Performance was reviewed on 10 June 2015, and after the trial the city reviewed two further aquatic sites.