Key results
No further sprayer clogging
Valve drips stopped
Stable irrigation pressure

Case Study from HydroFLOW Tunisia

The Challenge

  • Irrigation system limescale formed on nozzles, valves and hydraulic rails
  • Spray nozzles blocked frequently as mineral deposits accumulated
  • Sprayers had to be dismantled, chemically cleaned and reassembled
  • Deposits on seals caused shut-off valves and hydraulic rails to drip
  • Well water had a total hardness of 35 °fH, equivalent to 350 ppm

The Solution

One HydroFLOW® K40 was installed on the 50 mm irrigation line after the transfer pump, treating the hard well water supplying the six acre Cycas nursery. The signal disrupts the conditions that let mineral deposits bond to surfaces, so nozzles stopped blocking, valve seals stopped dripping and irrigation pressure stayed stable.

Key Outcomes

R

No blocked spray nozzles reported after several months

R

Steady, precise irrigation across the six acre nursery

R

Sealing valves and hydraulic rails no longer dripped

R

Irrigation pressure remained stable

Independent Verification

All results in this study were measured and verified by third-party facilities managers and technical staff.

Ready to see more?

Ready to explore sustainable water treatment?

Get in touch to find out how HydroFLOW® can work for you.

© 2026 Hydropath Technology Ltd. All rights reserved