Philippines Injection Moulding: Yearly Cleaning, No Overheating

Home 9 Case Studies and Results 9 Philippines Injection Moulding: Yearly Cleaning, No Overheating
Key results
1 year maintenance interval
0 overheating stoppages
11 months stable operation

Mould cooling water scale across 40 machines

Mould cooling water scale was building up at a Philippine injection moulding plant running 40 machines and four cooling towers on hard deep well water. Scaling continued despite chemical dosing, acid cleaning was needed every three to six months, and machines were stopping with overheating in between, costing output on a plant that runs three shifts. In February 2015 three HydroFLOW® units were installed across the heat exchangers and chillers, with a side stream filter. Scale was brought under control, cleaning stretched to a yearly interval and the overheating stoppages ended.

The Challenges

  • Mould cooling water scale was building on hard deep well water
  • Scaling continued despite chemical dosing
  • Acid cleaning was required every 3 to 6 months
  • Machines were stopping with overheating between cleans
  • Forty machines and four cooling towers had to be covered

The Solution

  • Units installed: three HydroFLOW® units, with a side stream filter
  • Installation point: heat exchangers and chillers
  • Installed: February 2015
  • System: 40 machines and four cooling towers
  • Water: hard deep well water

Three units were placed across the heat exchangers and chillers, serving all 40 machines and four towers. A side stream filter was fitted alongside to handle the deposits released during the first months. The signal disrupts the conditions that bond scale to surfaces, and mould cooling water scale no longer stops machines with overheating.

Key Outcomes

R

Chemical dosing reduced to minimal chlorine

R

Machines ran without overheating stoppages

R

Cleaning extended from 3-6 months to yearly

R

Scaling reduced across heat exchangers

Independent Verification

All results in this study were measured and verified by third-party facilities managers and technical staff.

Summary

Acid cleaning moved from every three to six months to once a year, and the overheating stoppages ended. Deep well water in the tropics is hard and warm, which is the worst combination for cooling circuits, so yearly cleaning on that water across 40 machines is the figure worth noting. The side stream filter was the practical detail that made the transition smooth on a plant of this size. Chemical dosing is now the backup, not the front line.

Ready to see more?

Ready to explore sustainable water treatment?

Get in touch to find out how HydroFLOW® can work for you.

© 2026 Hydropath Technology Ltd. All rights reserved