Texas DAF: 50% Less Chemical, 6x Cleaning Interval

Home 9 Case Studies and Results 9 Texas DAF: 50% Less Chemical, 6x Cleaning Interval
Key results
~50% polymer and chlorine cut
6x longer cleaning interval
Improved TSS separation

Summary

Polymer and chlorine dosing was reduced by roughly 50%, and the cleaning and water replacement interval extended from one week to six. Suspended solids separation improved, producing cleaner water and drier cake, odour was reduced dramatically, and less frequent cleaning gave significant water savings.

Case Study from HydroFLOW USA

Dissolved air flotation chemicals cut by roughly 50% at a Texas plant

Dissolved air flotation chemicals, chlorine and polymer, needed reducing on the recirculating wastewater at a Texas packaging facility. The water was murky, and microbial contamination caused strong foul odours. Cleaning and water replacement were too frequent. For a 14-week evaluation, one HydroFLOW® i150 was fitted to the six inch circulating pipe entering the DAF tank. Polymer and chlorine dosing was reduced by roughly 50%, the cleaning interval extended from one week to six, odour was reduced dramatically and the water was cleaner.

The Challenges

  • Dissolved air flotation chemicals, chlorine and polymer, needed reducing
  • Recirculating wastewater was murky and microbially contaminated
  • Microbial contamination caused strong foul odours
  • Cleaning and water replacement were too frequent

The Solution

  • Unit installed: one HydroFLOW® i150
  • Installation point: wastewater circulating pipe entering the DAF tank
  • Pipe size: six inch
  • Trial: 14-week evaluation
  • Previous treatment: chlorine and polymer dosing

The unit was fitted to the wastewater circulating pipe entering the DAF tank and left in place for the 14-week evaluation. During the evaluation, suspended solids separation improved, producing cleaner water and drier cake, and the foul odour caused by microbial contamination was reduced dramatically. Dissolved air flotation chemicals, polymer and chlorine, were reduced by roughly 50%, and cleaning and water replacement intervals were extended from one week to six.

Key Outcomes

R

Polymer and chlorine use cut by roughly 50%

R

Better TSS separation and drier cake

R

Cleaning cycle extended from 1 to 6 weeks

R

Foul odour reduced dramatically

Independent Verification

All results in this study were measured and verified by third-party facilities managers and technical staff.