Yakima Condensers: Chemicals Out, ROI in About a Year

Home 9 Case Studies and Results 9 Yakima Condensers: Chemicals Out, ROI in About a Year
Key results
Chemical treatment eliminated
Blowdown under once a month
Estimated ROI of roughly one year

Summary

All three chemicals were stopped during the evaluation and remained discontinued, conductivity stayed below 1,600 µS throughout the 12 months, and the estimated ROI was roughly one year.

Case Study from HydroFLOW USA

Chemical free condenser water treatment at G & G Orchards

Chemical free condenser water treatment was the goal at G & G Orchards in Yakima, where two condensers, a BAC and an EVAPCO, were dosed with descalant, biocide and anti-corrosion chemicals. Despite chemical treatment, the BAC tubes had hard scale, the EVAPCO fins had scale and biological growth, and the common sump had scum, biological growth and corrosion. A HydroFLOW® P100 was fitted to the BAC in September 2011 and a P120 to the EVAPCO in March 2012, both at the common sump discharge. Over 12 months, with all chemicals stopped, blowdown fell to less than once a month, conductivity held below 1,600 µS and the BAC tube scale went from an eighth of an inch of hard deposit to a thirty-second of soft, wipeable scale.

The Challenge

  • Chemical free condenser water treatment was needed to replace descalant, biocide and anti-corrosion dosing
  • Hard scale accumulated on the BAC heat exchange tubes
  • Scale and biological growth affected the EVAPCO condenser fins
  • Scum, biological growth and corrosion affected the common sump
  • The problems persisted despite chemical treatment

BAC condenser tubes before and after HydroFLOW, scale removed with chemical-free treatment at G and G Orchards, Yakima

The Solution

  • Units installed: HydroFLOW® P100 on the BAC, HydroFLOW® P120 on the EVAPCO
  • Installation point: common sump discharge, for both condensers
  • Installed: P120 on 1 March 2012, following the P100 on 20 September 2011
  • Monitoring period: 12 months
  • Dosing stopped: descalant, biocide and anti-corrosion chemicals

Chemical free condenser water treatment was introduced one condenser at a time, starting with the BAC in September 2011 and adding the EVAPCO the following March. Chemical dosing stopped and stayed stopped. Blowdown, conductivity and the condition of the BAC tubes were logged over 12 months, and the scale that remained turned soft enough to wipe off.

Testimonial

“My cooling towers were never this clean when they were on chemicals.” — G & G Orchards owner

Key Outcomes

R

Descalant, biocide and anti-corrosion chemicals all discontinued

R

Conductivity held below 1,600 µS across 12 months

R

Blowdown reduced to less than once a month

R

BAC tubes went from 1/8" hard scale to 1/32" soft, wipeable scale

Independent Verification

All results in this study were measured and verified by third-party facilities managers and technical staff.

Ready to see more?

Ready to explore sustainable water treatment?

Get in touch to find out how HydroFLOW® can work for you.

© 2026 Hydropath Technology Ltd. All rights reserved