Case Study from Hydropath Poland
Injection moulding cycle time and cooling channel scale
Injection moulding cycle time was stretching at a Polish plant because scale and biofilm in the mould cooling channels were cutting heat transfer. Rotometers needed cleaning every month, and cycle time and operating costs had increased. In July 2017 two HydroFLOW® P120 units and one S38 were fitted to the cooling circuits and the heat exchanger, on 114 mm and 30 mm pipe. Scale and biofilm deposits were reduced, cycle time came down, rotometer cleaning became less frequent and the ion exchange softeners were removed.
The Challenges
The Solution
- Units installed: two HydroFLOW® P120 and one S38
- Installation point: cooling circuits and heat exchanger
- Pipe size: 114 mm and 30 mm
- Installed: July 2017
- Previous treatment: ion exchange softeners, since removed
The two P120 units and the S38 were fitted to the cooling circuits and the heat exchanger. HydroFLOW® treatment reduced mineral and biofilm deposits, and the ion exchange softeners were disconnected after installation. Injection moulding cycle time fell as improved heat transfer increased cooling efficiency.