The Challenges
- Ferric dosing fixed at 200 ppm
- High chemical cost and carbon impact
- System running near operational limits
- Risk of fines if limits exceeded
The Solution
Two HydroFLOW® Custom units (12″ and 14″) were fitted to the DAF feed lines in October 2023 for a 90-day trial. The signal improves flocculation, so staged ferric reduction held discharge compliance while cutting chemical cost and carbon footprint.
