Mould cooling water scale across 40 machines Mould cooling water scale was building up at a Philippine injection moulding plant running 40 machines and four cooling towers on hard deep well water. Scaling continued despite chemical dosing, acid cleaning was needed...
Case Study from Hydropath Poland Injection moulding cycle time and cooling channel scale Injection moulding cycle time was stretching at a Polish plant because scale and biofilm in the mould cooling channels were cutting heat transfer. Rotometers needed cleaning every...
Case Study from HydroFLOW Ukraine Wave pool chlorine reduction and water clarity Wave pool chlorine reduction was needed at a 620 cubic metre wave pool in Ukraine that was regenerating its filters frequently and dosing chlorine heavily. Biofilm was forming on the...
Pool chemical reduction on two pools Pool chemical reduction was needed at two pools in India, of 445,000 and 110,000 litres, that were backwashed every 48 hours and dosed heavily with chlorine. The water carried a strong chlorine odour and was losing clarity to...
Case Study from HydroFLOW France Swimming pool water saving through fewer backwashes Swimming pool water saving was needed at an indoor pool in Colmar that backwashed its filters 78 times a year. Each wash used 52.5 cubic metres of heated, chlorinated water, and...