Case Study from HydroFLOW USA The Challenge 112 ice machines across facility Cleaning required every 3–4 months Biofilm buildup inside machines Legionella risk in water system The Solution One HydroFLOW® S38 was installed in July 2022 on the water line feeding an ice...
Struvite in wastewater may be a familiar problem to operators, but its true cost is often measured in blocked pipework, disrupted dewatering, premature equipment wear and repeated maintenance. Since I began working directly with the wastewater treatment industry in...
Case Study from EMTIVAC The Challenge The seawater strainer cleaning interval had fallen to once every two weeks Mussels and crustaceans attached to pipework and strainer areas Growth returned quickly after repeated cleaning Lines were hot-soaked and back flushed...
Case Study from Hydropath Asia The Challenge Plate heat exchanger macrofouling kept blocking the seawater channels despite screening and chlorination Mussels and barnacles restricted the seawater channels Biofilm impaired heat rejection across the PHE plates Higher...
Case Study from HydroFLOW Italy The Challenge Pump impellers became blocked by heavy scale deposits Engine overheating resulted from scaling buildup Acid cleaning was necessary every three months Metal rings and hydraulic joints experienced cracking The Solution A...