BHFZ Ukraine: Steam Boiler Drum Scale-Free at 11 Months

Home 9 Case Studies and Results 9 BHFZ Ukraine: Steam Boiler Drum Scale-Free at 11 Months
Key results
1.5 to 2 mm scale removed
No scale in drum at 11 months
Blowdown cut to a minimum

Steam boiler descaling at a pharmaceutical plant

Steam boiler descaling was the challenge at PJSC SIC Borshchagiv Chemical and Pharmaceutical Plant (BHFZ) in Ukraine, where dense hard scale 1.5 to 2 mm thick coated the boiler’s screen tubes and internal surfaces. Manual blowdown was needed two to three times a day, using extra water and gas, and salt content and alkalinity had to be monitored in the laboratory. One HydroFLOW® i60 was fitted after the feed pumps on the supply line to the boiler. During the 90-day trial the established scale broke away and the screen tubes became almost scale-free, and at the 11-month inspection no scale deposits were found in the drum.

The Challenge

  • Steam boiler descaling was needed for dense hard scale on the screen tubes and internal surfaces
  • Existing deposits were about 1.5 to 2 mm thick
  • Blowdown was needed two to three times a day
  • Frequent blowdown increased water and gas use
  • Salt content and alkalinity needed laboratory monitoring

The Solution

  • Unit installed: one HydroFLOW® i60
  • Installation point: supply line to the steam boiler, after the feed pumps
  • Trial: 90 days
  • Inspection: internal drum inspection after 11 months

For steam boiler descaling without opening up the boiler, the i60 treated the feed water after the pumps. Through the 90-day trial, established scale exfoliated from the screen tubes, collectors and drum, salt content and total alkalinity began falling and stabilising from the second week, and periodic blowdown was gradually brought down to a minimum.

Key Outcomes

R

Initial scale 1.5 to 2 mm thick

R

Blowdown reduced to a minimum

R

Screen tubes almost scale-free after the trial

R

No scale in the drum at 11 months

Independent Verification

All results in this study were measured and verified by third-party facilities managers and technical staff.

Summary

A HydroFLOW® i60 removed long-standing scale from the BHFZ steam boiler during a 90-day trial, steadied the water chemistry and brought blowdown down to a minimum, and the plant reported significant gas and water savings. The 11-month inspection is what makes it convincing: the drum was opened again and no scale deposits were found, only a thin rust layer that was easily removed.