Calcium deposit reduction on recycled water pipelines
A calcium deposit reduction was needed at a Czech concrete plant, where recycled water with a high lime content was clogging pipes and valves. The water ran through DN80 pipelines at 70 litres every four minutes. Build-up was affecting the accuracy of the mass scale and of dosing, and frequent cleaning and shutdowns were needed. Three HydroFLOW® i130 units were fitted to the recycled water pipelines. Calcium deposits fell by up to 75%, encrustation in the pipes and valves was cut, and dosing accuracy improved. Cleaning and shutdowns became less frequent.
The Challenges
- A calcium deposit reduction was needed with deposits clogging pipes and valves
- The recycled water had a high lime content
- Build-up was affecting the accuracy of the mass scale
- Calcium deposits were affecting dosing accuracy
- Frequent cleaning and shutdowns were required
The Solution
- Units installed: three HydroFLOW® i130
- Installation point: recycled water pipelines
- Pipe size: DN80
- Water: recycled, high lime content, 70 litres every four minutes
The three units were fitted directly to the DN80 recycled water pipelines. The HydroFLOW® treatment cut encrustation in pipes and valves and improved dosing accuracy. The calcium deposit reduction was up to 75%.