Calorifier scale from trial to rollout
Calorifier scale was affecting the electrical calorifier system at a flagship casino hotel in Macau. The customer needed proven results before expanding treatment, and the scale buildup required a proven long-term solution. A HydroFLOW® P100 trial was carried out on the calorifiers in 2021. The customer confirmed performance during the trial, and in January 2025 HydroFLOW® protection was expanded across the flagship hotel, with 11 P100 units installed. Scale was reduced in the protected calorifiers of the hotel’s hot water system, and further deployment to other hotels is planned for 2026.
The Challenge
- Calorifier scale was affecting the electrical calorifier system
- The customer needed proven results before expansion
- Scale buildup in the electrical calorifiers required a proven long-term solution
- There were ongoing scale concerns across the hotel
The Solution
- Unit installed: HydroFLOW® P100, trialled in 2021, then 11 P100 units
- Installation point: electrical calorifiers
- Trial: HydroFLOW® P100 on the electrical calorifiers in 2021
- Installed: 11 units rolled out in January 2025
The P100 trial on the electrical calorifiers began in 2021, and the customer confirmed performance during the trial. In January 2025 HydroFLOW® protection was expanded across the 1,500-room flagship hotel with 11 P100 units, and scale was reduced in the protected calorifiers.