Concrete plant acid cleaning eliminated
Concrete plant acid cleaning was needed twice a year at a plant in the Netherlands, where the process pipeline scaled up and both the pump and the pipeline had to be acid cleaned. Each clean meant downtime that disrupted the site’s continuous operation, and scale reduced flow performance. In December 2014 one HydroFLOW® P60 was fitted to protect the pump and one i100 to protect the main process pipeline. Scale formation on the pump and pipeline was reduced, water flow remained stable, and at inspection in January 2016 the pump and pipeline had avoided acid cleaning for over a year, with cleaning labour and downtime costs reduced by 75%.
The Challenges
The Solution
- Units installed: one HydroFLOW® P60 and one i100
- Installation point: P60 on the pump, i100 on the main process pipeline
- Installed: December 2014
- Previous treatment: acid cleaning of the pump and pipeline twice a year
Scale was building in two places, so each got its own unit: the P60 on the pump and the i100 on the main process pipeline. With HydroFLOW® treatment, water flow remained stable and scale formation was reduced. By the January 2016 inspection, the pump and pipeline had gone over a year without concrete plant acid cleaning.