Netherlands Concrete: Acid Cleaning Eliminated

Home 9 Case Studies and Results 9 Netherlands Concrete: Acid Cleaning Eliminated
Key results
75% cleaning cost savings
2 annual acid cleans removed
1 year no cleaning required

Concrete plant acid cleaning eliminated

Concrete plant acid cleaning was needed twice a year at a plant in the Netherlands, where the process pipeline scaled up and both the pump and the pipeline had to be acid cleaned. Each clean meant downtime that a continuous production plant could not absorb comfortably, and flow performance fell between cleans. In December 2014 one HydroFLOW® P60 was fitted to protect the pump and one i100 to protect the main process pipeline. The twice-yearly scaling stopped, flow held and the acid cleans were eliminated, taking their downtime with them. Acid handling has been removed from the site.

The Challenges

  • Concrete plant acid cleaning was needed twice a year as the pipeline scaled up
  • Both the pump and the pipeline needed acid cleaning
  • Cleaning downtime was affecting continuous production
  • Scale was reducing flow performance between cleans
  • The plant wanted to remove acid handling from the site

The Solution

  • Units installed: one HydroFLOW® P60 and one i100
  • Installation point: P60 on the pump, i100 on the main process pipeline
  • Installed: December 2014
  • Previous treatment: acid cleaning of the pump and pipeline twice a year

Scale was building in two places, so each got its own unit: the P60 on the pump and the i100 on the main process pipeline. The signal disrupts the conditions that bond scale to surfaces, so flow holds between what used to be cleaning intervals. Since December 2014 concrete plant acid cleaning has not been scheduled on the process line.

Key Outcomes

R

Flow rate stayed consistently high

R

Cleaning labour and downtime cut 75%

R

No acid cleaning needed for over a year

R

Pump and pipeline scale formation reduced

Independent Verification

All results in this study were measured and verified by third-party facilities managers and technical staff.

Summary

Two small units ended twice-yearly acid cleaning of the pump and pipeline, and flow has held at design rate through every production season since. The plant runs around the clock, so every hour of downtime is production lost, and the value of removing an acid clean is the downtime it takes with it. With no acid cleans to schedule, the acid store was closed and acid handling was removed from site.

Ready to see more?