Luton WWTP: No New Struvite Scale in Centrate Lines

Home 9 Case Studies and Results 9 Luton WWTP: No New Struvite Scale in Centrate Lines
Key results
0 new scale formation
6 month trial duration
Reduced maintenance demand

Case Study from HYDROPATH

The Challenges

  • Severe struvite scale in centrate lines
  • Frequent maintenance and pipe bypassing
  • Scaling reappearing within weeks
  • Limited access for internal inspection

The Solution

One HydroFLOW® unit was fitted to the sludge feed pipe in an adjacent building ceiling, chosen for access and power supply, for a 6-month trial. The signal disrupts the conditions that let struvite bond to surfaces, preventing further build-up in the centrate line.

Key Outcomes

R

No additional scale during the 6-month trial

R

Centrifuge operated more efficiently

R

Lower maintenance from stable scale conditions

R

Longer service intervals achieved

Independent Verification

All results in this study were measured and verified by third-party facilities managers and technical staff.