The Challenges
- Weekly condenser cleaning required
- ATCS balls replaced every 2 months
- System shutdowns for maintenance
- Risk of damage and pipe cutting for ball retrieval
The Solution
Two HydroFLOW® Custom P units were fitted to the cold feed to the condensers in December 2016, on water at 1000 ppm hardness. The signal disrupts the conditions that bond scale to surfaces, holding a stable condenser approach and removing reliance on mechanical cleaning.