Ice machine biofilm across a hospital estate
Ice machine biofilm was building up inside the 112 ice machines at a US hospital, and each machine needed cleaning every three to four months because of the build-up and the associated Legionella risk. In July 2022 a HydroFLOW® S38 was installed on the water line feeding one ice machine to reduce biofilm and extend cleaning intervals. Within three weeks it flushed out hidden biofilm that previous cleaning had not removed, very little fouling was seen over 10 months, and cleaning intervals were extended beyond three to four months. The results led to rollout across all 112 machines.
The Challenge
- Ice machine biofilm build-up meant cleaning every three to four months
- 112 ice machines operated across the facility
- Cleaning was not removing hidden biofilm inside the machines
- Biofilm was a Legionella risk in the water system
The Solution
- Unit installed: one HydroFLOW® S38
- Installation point: water line feeding one ice machine
- Installed: July 2022
- Results: hidden biofilm purged within three weeks; very little fouling over 10 months
- Previous treatment: cleaning every three to four months
One machine was treated first, to reduce biofilm and extend cleaning intervals. Over three weeks the treatment flushed out hidden ice machine biofilm that routine cleaning had not removed, and cleaning intervals were extended beyond three to four months. The results led to rollout across all 112 machines.