Summary

Within three weeks, one S38 on one ice machine flushed out hidden biofilm that prior cleaning had not removed, and very little fouling was observed over 10 months. The results led to rollout across all 112 machines.

Case Study from HydroFLOW USA

Ice machine biofilm across a hospital estate

Ice machine biofilm was building up inside the 112 ice machines at a US hospital, and each machine needed cleaning every three to four months because of the build-up and the associated Legionella risk. In July 2022 a HydroFLOW® S38 was installed on the water line feeding one ice machine to reduce biofilm and extend cleaning intervals. Within three weeks it flushed out hidden biofilm that previous cleaning had not removed, very little fouling was seen over 10 months, and cleaning intervals were extended beyond three to four months. The results led to rollout across all 112 machines.

The Challenge

  • Ice machine biofilm build-up meant cleaning every three to four months
  • 112 ice machines operated across the facility
  • Cleaning was not removing hidden biofilm inside the machines
  • Biofilm was a Legionella risk in the water system

The Solution

  • Unit installed: one HydroFLOW® S38
  • Installation point: water line feeding one ice machine
  • Installed: July 2022
  • Results: hidden biofilm purged within three weeks; very little fouling over 10 months
  • Previous treatment: cleaning every three to four months

One machine was treated first, to reduce biofilm and extend cleaning intervals. Over three weeks the treatment flushed out hidden ice machine biofilm that routine cleaning had not removed, and cleaning intervals were extended beyond three to four months. The results led to rollout across all 112 machines.

Key Outcomes

R

Significant hidden biofilm released within 3 weeks

R

Cleaning intervals extended beyond 3–4 months

R

Very little fouling observed over 10 months

R

Installed across all 112 ice machines

Independent Verification

All results in this study were measured and verified by third-party facilities managers and technical staff.

Ready to see more?

Ready to explore sustainable water treatment?

Get in touch to find out how HydroFLOW® can work for you.

© 2026 Hydropath Technology Ltd. All rights reserved