Case Study from HydroFLOW Chile
Seawater intake cleaning interval at a desalination plant
The seawater intake cleaning interval at a desalination plant in Chile was short, because mussels and marine organisms kept building up inside its seawater suction lines. Fouling regrowth meant frequent maintenance, and chemical dosing risked higher cost and environmental impact. On 28 November 2024 a HydroFLOW® Custom i20 inch unit was installed on the Line 4 seawater suction line, with Line 6 left untreated as a control. Four inspections were carried out over 223 days. Line 4 ran the full period with no cleaning and no chemicals and kept its flow, while the untreated line continued to foul.
The Challenge
- The seawater intake cleaning interval was short as mussels and marine organisms built up
- Blockages reduced flow and affected operational efficiency
- Fouling regrew, so frequent maintenance was needed
- Chemical dosing risked higher cost and environmental impact
The Solution
- Unit installed: One HydroFLOW® Custom i20 inch unit
- Installation point: Line 4 seawater suction line
- Installed: 28 November 2024
- Trial: 223 days, four inspections, untreated Line 6 as control
The pilot compared a treated line with an untreated control. The unit went on Line 4 while Line 6 was left untreated, and both lines were inspected four times over 223 days. No mussel proliferation was observed in the treated line, which remained visibly clear of marine biofouling, and Line 4 ran the full period without cleaning or chemical dosing. Line 6, left untreated, developed significant fouling, including mussels over 3 cm.