Key results
€7,850 annual chemical savings
Up to 75% water saved
0 chemical dosing required

Summary

Twelve units across six towers controlled scaling and reduced nozzle clogging, with no chemical dosing required. Water use fell by up to 75% compared with continuous blowdown and by at least 20% compared with a conditioned tower, and annual chemical costs of at least €7,850 were eliminated.

Case Study From Maimtec

Data centre cooling water treatment without chemicals

Data centre cooling water treatment had to solve a limescale problem at an Amsterdam data centre, where scale on the spray nozzles, cooling packs and pipework of six BAC cooling towers was costing cooling efficiency. A vortex-type conditioner had already been tried and had not controlled the scaling. The site needed to avoid chemical dosing. In February 2022, following a trial on two towers, twelve HydroFLOW® i-130 units were fitted to the return pipes of all six towers. Scaling was controlled, with nozzle clogging and internal scaling reduced, and water use fell by up to 75% compared with continuous blowdown and by at least 20% compared with a conditioned tower, with no chemical dosing required.

The Challenge

  • Data centre cooling water treatment was needed for persistent limescale on spray nozzles, cooling packs and pipework
  • A previous vortex conditioner had failed to control the scaling
  • Clogged nozzles were reducing cooling system efficiency
  • The site needed an effective solution that avoided chemical dosing

Data centre cooling pipes before and after HydroFLOW treatment

The Solution

  • Units installed: twelve HydroFLOW® i-130
  • Installation point: return pipes of all six BAC cooling towers
  • Installed: February 2022, following a trial on two towers
  • Previous treatment: vortex-type conditioner, which had not controlled the scaling

The units were fitted to the tower return pipes from the basin to the spray system, so data centre cooling water treatment began without any chemical dosing. Scaling was controlled, with nozzle clogging and internal scaling reduced. Water use fell by up to 75% compared with continuous blowdown operation.

Key Outcomes

R

Annual chemical costs of at least €7,850 eliminated

R

At least 20% water saving vs conditioned tower

R

Up to 75% water saving vs continuous blowdown

R

Six BAC towers running with no chemical dosing

Independent Verification

All results in this study were measured and verified by third-party facilities managers and technical staff.