Evaporator chemical dosing stopped on a fresh water generator
Evaporator chemical dosing was needed to keep this Japanese vessel’s fresh water generator performing, and scale was building up on the FWG plates. The cleaning intervals were affecting operation, and stable water production had to be maintained. In January 2016 a HydroFLOW® HM unit was fitted to the fresh water generator system to treat scaling and eliminate the need for chemical dosing. Chemical dosing was then stopped, with no further chemical use recorded, and water production remained stable at around 15 tonnes per day. Scale remained present but became soft and could be removed by hand, making cleaning easier.
The Challenges
- Evaporator chemical dosing was required to maintain FWG performance
- Scale was building on the fresh water generator plates
- Cleaning intervals were affecting operation
- Stable water production had to be maintained
The Solution
- Unit installed: One HydroFLOW® HM unit
- Installation point: fresh water generator system
- Installed: January 2016
- Dosing stopped: FWG chemical dosing
The unit was fitted to the fresh water generator system and evaporator chemical dosing was stopped. With the unit in place, scale deposits became soft and could be removed by hand, and detached scale particles moved and accumulated at outlet areas of the system. Water production remained consistent, and performance monitored over five months showed stable FWG operation.