MV Detroit Express: 86% Less CIP Cleaning, No Chemicals

Home 9 Case Studies and Results 9 MV Detroit Express: 86% Less CIP Cleaning, No Chemicals
Key results
86% CIP cleaning reduction
58% fewer FWG openings
0 chemicals used

Summary

CIP chemical cleaning fell by 86%, from about 36 cleans to 5 in 12 months, and FWG openings fell from 12 to 5. Only soft scale remained, and it was easily removed without chemicals. Dosing and cleaning chemicals were no longer required.

CIP cleaning reduction on a fresh water generator

A CIP cleaning reduction was needed on MV Detroit Express, where the fresh water generator went through clean-in-place chemical cleaning every 10 to 12 days and was opened monthly for manual cleaning on top. Scale, bacteria, algae and slime were all fouling the plates, and chemicals were used both for dosing and for plate cleaning. In August 2016 an HM-100 was fitted to the seawater inlet pipe, after the feed pump and before the generator. CIP chemical cleaning fell by 86% and FWG openings fell from 12 to 5 in 12 months. Only soft scale remained, and it came off easily without chemicals.

The Challenges

  • A CIP cleaning reduction was needed, with chemical cleaning every 10 to 12 days
  • The FWG was opened monthly for manual cleaning
  • Scale, bacteria, algae and slime were all fouling the plates
  • Chemicals were used for both dosing and plate cleaning

Fresh water generator plates before and after treatment – Detroit Express

The Solution

  • Unit installed: One HM-100
  • Installation point: seawater inlet pipe, after the feed pump and before the FWG
  • Installed: August 2016
  • Previous treatment: CIP chemical cleaning every 10 to 12 days, plus chemical dosing

The HM-100 was placed on the seawater inlet after the feed pump, so all seawater feeding the generator passes the unit first. The objective was chemical-free treatment of scale and of biofouling from bacteria, algae and slime on the inlet side and the titanium heat exchanger plates. Only soft scale remained, and it was easily removed without chemicals. The CIP cleaning reduction reached 86%, with CIP cleans falling from about 36 to 5 in 12 months, and FWG openings fell from 12 to 5.

Key Outcomes

R

CIP cleans fell from about 36 to 5 in 12 months

R

Dosing and cleaning chemicals no longer needed

R

FWG openings reduced from 12 to 5

R

No CIP needed for around 2.5 months

Independent Verification

All results in this study were measured and verified by third-party facilities managers and technical staff.

Ready to see more?