Middle East Hospital: 17 Months With No Acid Cleaning

Home 9 Case Studies and Results 9 Middle East Hospital: 17 Months With No Acid Cleaning
Key results
17+ months scale-free operation
0 acid cleanings since install
0 shutdowns for cleaning

Hospital heat exchanger acid cleaning on 380 ppm water

Hospital heat exchanger acid cleaning was shutting down a Middle East hospital every three to four months, on municipal water above 380 ppm CaCO₃. Thermal efficiency dropped between cleans, the acid handling was a safety risk in a healthcare setting, and the cleaning agents were wearing seals and gaskets. On 5 February 2024 two HydroFLOW® units were installed: a Pearl Plus on the make-up water line and an i100 on the heat exchanger inlet, with a HydroKNCT remote monitoring unit. There was no downtime and no plumbing change. In the 17 months since, the heat exchangers have needed no acid clean and no shutdown for descaling.

The Challenge

  • Hospital heat exchanger acid cleaning meant shutdowns every three to four months
  • Thermal efficiency in the heat exchangers dropped between cleans
  • Acid handling was a safety risk in a healthcare setting
  • Cleaning agents were wearing seals and gaskets
  • Municipal water was above 380 ppm CaCO₃

The Solution

  • Units installed: HydroFLOW® Pearl Plus and HydroFLOW® i100 with HydroKNCT
  • Installation point: Pearl Plus on the make-up water line, i100 on the heat exchanger inlet
  • Installed: 5 February 2024 with no downtime or plumbing changes
  • Monitoring period: 17 months, remotely via HydroKNCT
  • Water: municipal supply above 380 ppm CaCO₃

The aim was to end hospital heat exchanger acid cleaning without touching the plumbing. The two units were fitted around the existing pipe, one where the hard make-up water enters the system and one at the heat exchanger inlet. The signal disrupts the conditions that bond scale to surfaces, so limescale crystallisation is prevented despite the hard supply. HydroKNCT reports on the installation remotely.

Key Outcomes

R

No cleaning required for over 17 months

R

Pressure, temperature and flow remained stable

R

Shutdowns every 3–4 months eliminated

R

Results confirmed by site team after 17 months

Independent Verification

All results in this study were measured and verified by third-party facilities managers and technical staff.

Summary

Seventeen months on 380 ppm water without an acid clean or a descaling shutdown is the interval to compare against. For a hospital, removing an acid clean removes a shutdown and a chemical handling risk at the same time, and it ends the seal and gasket wear the cleaning agents caused. The units fitted around the existing pipe in a morning, with no downtime or plumbing changes, so the heat exchangers stayed in service throughout.

Ready to see more?

Ready to explore sustainable water treatment?

Get in touch to find out how HydroFLOW® can work for you.

© 2026 Hydropath Technology Ltd. All rights reserved