The Challenges
- Scale can reduce FWG efficiency
- No chemical dosing system installed onboard
- Manual cleaning increasing downtime
- Maintenance costs needing reduction
The Solution
One HM120 unit was fitted to the seawater inlet pipe about 10 metres from the fresh water generator in January 2014. The signal disrupts the conditions that bond scale to surfaces, so the FWG ran 18 months at full output with no cleaning or chemicals.
