MV Hoegh Antwerp: 18 Months, No Cleaning, No Chemicals

Home 9 Case Studies and Results 9 MV Hoegh Antwerp: 18 Months, No Cleaning, No Chemicals
Key results
20.5 MT/day output held
18 months no cleaning
0 chemicals used

The Challenges

  • Scale can reduce FWG efficiency
  • No chemical dosing system installed onboard
  • Manual cleaning increasing downtime
  • Maintenance costs needing reduction

The Solution

One HM120 unit was fitted to the seawater inlet pipe about 10 metres from the fresh water generator in January 2014. The signal disrupts the conditions that bond scale to surfaces, so the FWG ran 18 months at full output with no cleaning or chemicals.

Key Outcomes

R

FWG held full output at 20.5 MT/day

R

No chemical dosing during the trial

R

Ran 18 months without opening for cleaning

R

No scale observed at inspection

Independent Verification

All results in this study were measured and verified by third-party facilities managers and technical staff.

Ready to see more?

Ready to explore sustainable water treatment?

Get in touch to find out how HydroFLOW® can work for you.

© 2026 Hydropath Technology Ltd. All rights reserved