Key results
150% conductivity increase
0 scale deposits
9 months chemical-free

Summary

Conductivity rose by 150%, to 10,000 µS/cm, and the system ran for nine months without chemical treatment while the tower and chiller tubes remained free of scale deposits. Higher conductivity operation reduced cooling tower blowdown demand, chiller approach temperatures stayed within industry standards, and annual inspection confirmed clean, scale-free tubes.

Case Study from HydroFLOW USA

Raising cooling tower cycles of concentration without scale

Cooling tower cycles of concentration were being held low at a medical device manufacturer in the Phoenix Metro Area to avoid scale and protect chiller efficiency. Continuous chemical treatment was in place, and blowdown levels limited water savings at the plant. In March 2017 one HydroFLOW® unit was fitted to the condenser loop between the pump and the chiller. Conductivity was then raised by 150%, to 10,000 µS/cm, and the system ran for nine months without chemical treatment while the tower and chiller tubes remained free of scale deposits.

The Challenges

  • Cooling tower cycles of concentration were held low to avoid scale on the chiller
  • Chemical treatment was required continuously
  • Higher conductivity increased the risk of scale
  • Blowdown levels limited water savings
  • Scale was threatening chiller efficiency

The Solution

  • Unit installed: one HydroFLOW® unit
  • Installation point: condenser loop, between the pump and the chiller
  • Installed: March 2017
  • Dosing stopped: continuous chemical treatment discontinued

The unit was fitted to the condenser loop ahead of the chiller, and the system was then run chemical-free at much higher conductivity. The tower and chiller tubes remained free of scale deposits, and existing scale deposits gradually broke down during operation. Conductivity rose by 150%, to 10,000 µS/cm, higher conductivity operation reduced cooling tower blowdown demand, and chiller approach temperatures remained within industry standards. Annual inspection confirmed clean, scale-free tubes.

Key Outcomes

R

Tower and chiller tubes stayed scale-free

R

Ran 9 months without chemical treatment

R

Conductivity raised to 10,000 microsiemens

R

Annual inspection confirmed clean tubes

Independent Verification

All results in this study were measured and verified by third-party facilities managers and technical staff.