The Challenges Weekly condenser cleaning required ATCS balls replaced every 2 months System shutdowns for maintenance Risk of damage and pipe cutting for ball retrieval The Solution Two HydroFLOW® Custom P units were fitted to the cold feed to the condensers in...
Case Study from HydroFLOW Italy The Challenges High turbidity in discharge water Heavy reliance on polyelectrolyte dosing Inconsistent output with turbidity peaks Need to improve efficiency without more chemicals The Solution One HydroFLOW® P60 unit was fitted to the...
The Challenges Pipeline scaled up twice every year Pump and pipeline needing acid cleaning Downtime affecting continuous production Scale reducing flow performance The Solution One HydroFLOW® P60 unit was fitted to protect the pump and one i100 unit to protect the...
Case Study from Hydropath Poland The Challenges Scale and biofilm in cooling channels Rotometers requiring monthly cleaning Reduced heat transfer affecting cycle time Increased operating costs The Solution Two HydroFLOW® P120 units and one S38 unit were fitted to...
The Challenges Backwashing required every 48 hours High chlorine dosing required Strong chlorine odour present Algae growth affecting water clarity The Solution One HydroFLOW® P-160 unit was fitted before the pump on 130mm GI pipe in August 2019, serving two pools of...