Tulsa: No New Struvite on the Test Drum in 90 Days

Home 9 Case Studies and Results 9 Tulsa: No New Struvite on the Test Drum in 90 Days
Key results
No new scale on the cleaned drum
Deposits noticeably thinner
All 5 presses funded

Case Study from HydroFLOW USA

Belt press struvite cleaning at Tulsa Southside

Belt press struvite cleaning at the Tulsa Southside Wastewater Treatment Plant needed 3,500 psi water to loosen small pieces of hard scale, and all five belt filter presses were affected. One HydroFLOW® i Range unit was installed at the pump discharge, 50 ft upstream of an Andritz press, and monitored from 17 February to 31 May 2017 with CH2M verifying the trial. The cleaned drum surface stayed free of new struvite for the full 90 days, and heavily encrusted areas thinned noticeably. Some deposits could be scraped back to bare metal for the first time. The plant then funded treatment of the header feeding all five presses.

The Challenge

  • Belt press struvite cleaning required frequent, labour-intensive high-pressure work
  • Heavy struvite encrustation covered the drum and other belt press surfaces
  • All five of the plant’s belt filter presses experienced scale buildup
  • Operators needed 3,500 psi water to loosen small pieces of hard scale
  • Frequent scale removal placed a substantial labour burden on plant staff

Belt press pipe outlet before and after HydroFLOW, hard struvite scale reduced at Tulsa Southside WWTP, Oklahoma

The Solution

  • Belt press struvite cleaning required frequent, labour-intensive high-pressure work
  • Heavy struvite encrustation covered the drum and other belt press surfaces
  • All five of the plant’s belt filter presses experienced scale buildup
  • Operators needed 3,500 psi water to loosen small pieces of hard scale
  • Frequent scale removal placed a substantial labour burden on plant staff

Belt press struvite cleaning was the measure the trial was judged on. The unit treated the feed to a single Andritz press. Inspections over the 90 days tracked the cleaned drum surface for new growth, the thickness of the existing encrustation and how easily it came away when the operators power washed the press.

Key Outcomes

R

The cleaned drum surface stayed free of new struvite across the 90 day trial

R

Some deposits could be scraped back to bare metal, which was not possible before

R

Heavily encrusted areas showed noticeably thinner deposits after 90 days

R

The plant funded treatment of the header feeding all five belt presses

Independent Verification

All results in this study were measured and verified by third-party facilities managers and technical staff.

Summary

The cleaned drum stayed free of new struvite for 90 days, and power washing became markedly less labour-intensive. Tulsa is the labour case study: the result is measured in how hard the operators had to work. The plant's decision to fund treatment of the header feeding all five presses is the answer to that.