Case Study from HYDROPATH Asia The Challenges Condenser tubes cleaned with acid yearly Cooling towers cleaned twice yearly Scale build-up lowering chiller efficiency Continuous chemical treatment required The Solution One HydroFLOW® unit was fitted to the city water...
Case Study from HYDROPATH Asia The Challenges Hot spring water hardness above 400 ppm Some systems requiring monthly maintenance Scale build-up affecting pumps and piping Spa facilities requiring bacteria control The Solution More than 30 HydroFLOW® units were...
Case Study from HYDROPATH Asia The Challenges Critical scale build-up in the boiler system Safety valve failures during operation Chemical descaling prohibited by food rules Frequent downtime disrupting production The Solution One HydroFLOW® P Range unit was...