The Challenge Hot water pipework biofouling had built up across both new and decades-old sections Thick biofouling deposits altered water quality Rust layers and flakes accumulated inside the pipework Scale was also present inside the water-supply pipes The building...
Case Study from HydroFLOW Tunisia The Challenge Drip irrigation clogging affected more than 50% of emitters Well restart flushing took 30 minutes or more Weekly flushing and acid injection were required Daily winter restarts increased water loss and labour...
Case Study from HydroFLOW USA The Challenges Spray nozzles clogged with hard water scale Reclaimed water producing foul odours Uneven water distribution on rinse bars Frequent nozzle maintenance required The Solution One HydroFLOW® i60 and one HS40 unit were fitted to...
Case Study from HydroFLOW Italy The Challenges High turbidity in discharge water Heavy reliance on polyelectrolyte dosing Inconsistent output with turbidity peaks Need to improve efficiency without more chemicals The Solution One HydroFLOW® P60 unit was fitted to the...
Case Study from HydroFLOW Ukraine The Challenges Frequent filter regeneration required High chlorine dosing required Biofilm forming on the water surface Organic particles reducing clarity The Solution One HydroFLOW® unit was fitted before the circulation pump and...