Hydropath Technology logo
  • Home
  • How It Works
  • Applications
        • Scale & deposits
          • Limescale, gypsum & mineral scale
          • Struvite control
        • Fouling, bacteria & corrosion
          • Biofouling & biofilm control
          • Legionella control
          • Corrosion control
        • Cooling & heating
          • Cooling tower
          • Heat exchangers
          • Boilers & steam
          • Misting & spray systems
        • Wastewater & filtration
          • Flocculation & filtration
          • Dissolved air flotation (DAF)
          • Sludge dewatering, centrifuges & belt presses
          • Reverse osmosis
        • How the signal works →See it proven in the field →
  • Industries
        • Buildings & Facilities
          • Commercial buildings & facilities
          • Hotels
          • Hospitals
          • Data centres
        • Industrial Process
          • Manufacturing, industrial & mining
          • Food & beverage
          • Water & wastewater utilities
        • Specialist Sectors
          • Power Plants
          • Desalination
          • Marine & shipping
          • Agriculture
          • Swimming pools & leisure
        • Case studies by sector →Talk to an engineer →
  • Products
    • Residential
      • Pearl
      • Pearl Plus
      • HS40
    • Commercial
      • C Range
      • K40 Aquaklear
      • P Range
    • Industrial
      • I Industrial Range
      • Custom Range
      • Multihead Range
      • HM Range
    • Monitoring
      • HydroKNCT & Hydropath Care
    • Which unit do I need? Take the 2-minute quiz →Commercial & industrial (UK): contact us for pricing →Outside the UK? Find your distributor →
  • Case Studies
  • Insights
  • About
    • Why Us?
    • Find a Distributor
    • Become a Distributor
  • Shop
  • Contact
Palace of Parliament: 50% Less Biofouling in 6 Months

Palace of Parliament: 50% Less Biofouling in 6 Months

by Hydropath | Sep 1, 2026 | Case Studies and Results

The Challenge Hot water pipework biofouling had built up across both new and decades-old sections Thick biofouling deposits altered water quality Rust layers and flakes accumulated inside the pipework Scale was also present inside the water-supply pipes The building...
Saudi Olive Grove: Flushing Cut from 30 Minutes to 2

Saudi Olive Grove: Flushing Cut from 30 Minutes to 2

by Hydropath | Aug 10, 2026 | Case Studies and Results

Case Study from HydroFLOW Tunisia The Challenge Drip irrigation clogging affected more than 50% of emitters Well restart flushing took 30 minutes or more Weekly flushing and acid injection were required Daily winter restarts increased water loss and labour...
Palm Springs Car Wash: 60% Water Reuse, No Chemicals

Palm Springs Car Wash: 60% Water Reuse, No Chemicals

by Hydropath | Jun 4, 2026 | Case Studies and Results

Case Study from HydroFLOW USA The Challenges Spray nozzles clogged with hard water scale Reclaimed water producing foul odours Uneven water distribution on rinse bars Frequent nozzle maintenance required The Solution One HydroFLOW® i60 and one HS40 unit were fitted to...
Italy Flotation Plant: 20% Less Chemical, Clearer Water

Italy Flotation Plant: 20% Less Chemical, Clearer Water

by Hydropath | Jun 4, 2026 | Case Studies and Results

Case Study from HydroFLOW Italy The Challenges High turbidity in discharge water Heavy reliance on polyelectrolyte dosing Inconsistent output with turbidity peaks Need to improve efficiency without more chemicals The Solution One HydroFLOW® P60 unit was fitted to the...
Ukraine Wave Pool: 60% Less Chlorine, Clear Water

Ukraine Wave Pool: 60% Less Chlorine, Clear Water

by Hydropath | Jun 3, 2026 | Case Studies and Results

Case Study from HydroFLOW Ukraine The Challenges Frequent filter regeneration required High chlorine dosing required Biofilm forming on the water surface Organic particles reducing clarity The Solution One HydroFLOW® unit was fitted before the circulation pump and...
« Older Entries
  • 0115 986 9966
  • sales@hydropath.com
  • WhatsApp