Case Study from HYDROPATH Asia
A moulding softener alternative on 380 ppm water
A moulding softener alternative was needed at a Thai injection moulding plant running on water at 380 ppm hardness. The cooling tower was cleaned every two weeks, the heat exchanger was scaling and losing heat transfer, and the injection machines were overheating frequently, while water softener chemicals were used to manage scaling. In June 2002 one HydroFLOW® C60 was fitted to the cooling system pipework. It released the existing deposits as sediment, the heat exchanger remained free of hard scale deposits, and water softener chemicals were no longer required. Tower cleaning fell from every two weeks to once a month, taking around 10 minutes, and no further overheating was observed in the injection machines.
The Challenges
- A moulding softener alternative was needed for water at 380 ppm hardness
- The cooling tower had to be cleaned every two weeks
- Heat exchanger scaling was cutting heat transfer
- Injection machines were overheating frequently
- Chemical treatment was used to manage scale
The Solution
- Unit installed: one HydroFLOW® C60
- Installation point: cooling system pipework
- Installed: June 2002
- Water: 380 ppm hardness
- Previous treatment: softener chemicals
The unit was fitted to the cooling system pipework. With HydroFLOW® treatment, existing scale was released as sediment in the cooling tower. As a moulding softener alternative, it removed the need for water softener chemicals and reduced cooling tower cleaning from every two weeks to once a month.