Thailand Moulding: Softener Chemicals Gone, No Overheating

Home 9 Case Studies and Results 9 Thailand Moulding: Softener Chemicals Gone, No Overheating
Key results
0 water softener chemicals
10 min monthly cleaning
0 overheating incidents

Summary

Water softener chemicals were no longer required, cooling tower cleaning fell from every two weeks to once a month at around 10 minutes, and no further overheating was observed in the injection machines. Existing scale was released as sediment in the cooling tower, and the heat exchanger remained free of hard scale deposits.

Case Study from HYDROPATH Asia

A moulding softener alternative on 380 ppm water

A moulding softener alternative was needed at a Thai injection moulding plant running on water at 380 ppm hardness. The cooling tower was cleaned every two weeks, the heat exchanger was scaling and losing heat transfer, and the injection machines were overheating frequently, while water softener chemicals were used to manage scaling. In June 2002 one HydroFLOW® C60 was fitted to the cooling system pipework. It released the existing deposits as sediment, the heat exchanger remained free of hard scale deposits, and water softener chemicals were no longer required. Tower cleaning fell from every two weeks to once a month, taking around 10 minutes, and no further overheating was observed in the injection machines.

The Challenges

  • A moulding softener alternative was needed for water at 380 ppm hardness
  • The cooling tower had to be cleaned every two weeks
  • Heat exchanger scaling was cutting heat transfer
  • Injection machines were overheating frequently
  • Chemical treatment was used to manage scale

The Solution

  • Unit installed: one HydroFLOW® C60
  • Installation point: cooling system pipework
  • Installed: June 2002
  • Water: 380 ppm hardness
  • Previous treatment: softener chemicals

The unit was fitted to the cooling system pipework. With HydroFLOW® treatment, existing scale was released as sediment in the cooling tower. As a moulding softener alternative, it removed the need for water softener chemicals and reduced cooling tower cleaning from every two weeks to once a month.

Key Outcomes

R

Water softener chemicals no longer required

R

Cooling tower cleaned in around 10 minutes

R

Cleaning cut from bi-weekly to monthly

R

Injection machines ran without overheating

Independent Verification

All results in this study were measured and verified by third-party facilities managers and technical staff.