The Challenge
- Persistent limescale formed on spray nozzles, cooling packs and pipework
- A previous vortex treatment system had failed to control the scaling
- Clogged nozzles reduced cooling system efficiency
- The site needed an effective solution that avoided chemical dosing
The Solution
Twelve HydroFLOW® i-130 units were fitted to the return pipes of all six BAC towers in February 2022, with no shutdown required. The signal disrupts the conditions that bond scale to surfaces, so existing limescale loosens and washes through while new growth doesn’t form.
