Case Study from HydroFLOW France
The Challenges
- High backwash water consumption per wash
- 78 filter washes per year
- Heated chlorinated water wasted during washes
- Rising operating costs from water and energy use
The Solution
One HydroFLOW® P160 unit was fitted upstream of the filtration system in October 2014. The signal supports better flocculation before filtration, reducing backwash demand and cutting losses of heated, chlorinated water across the indoor pool.
